双组份打胶机安装条件有什么要求?
时间:2020-06-29 来源:/ 发布人:昌盛机械
1、双组份打胶机设备应安装在干燥、无粉尘、无腐蚀性气体的坏境中,该要求与其他设备一致,当然如果条件达不到至少争取无腐蚀性气体,毕竟设备中有电线以及管路这些配件抗腐蚀性不高。
1, the double component glue machine equipment should be installed in the dry, dust free, non corrosive gas, the requirement is consistent with other equipment, of course, if the conditions can not reach at least for corrosion free gas, after all, the equipment with wires and pipelines are not corrosion-resistant.
2、室内温度好控制在10~40度的室内坚硬地面上,地面应水平度要好。
2, indoor temperature is best controlled in 10~40 degree indoor hard ground, the ground should be better.
3、双组份打胶机安装之前,应先检查是否有因运输、搬动造成的变形、损坏和紧固件松动情况,之前就曾经有客户在移动打胶机的过程中把设备的智能控制系统的一个零部件碰掉了而导致设备无法正常运行,我们的工作人员到现场后才排查出的原因。

3. Before the installation of the double component glue machine, we should first check whether there is the deformation, damage and loosening of the fastener due to transportation and moving. Before the client has touched off one part of the equipment's intelligent control system in the process of moving the glue machine, which causes the equipment to be unable to run normally. The reasons for finding out after the scene.
4、我们可以根据地面平整度的实际情况来通过调整设备的可升降地脚螺栓来调整设备的水平度直到设备水平而稳固。然后按图接线并可靠接地,把气源接入机器所配带的气源接口,确保无漏气现象。
4. First, we can adjust the level of the equipment to the level of the equipment to the level of the equipment, according to the actual condition of the ground flatness. Then according to the diagram connection and reliable grounding, the air source is connected to the air source interface provided by the machine to ensure that there is no air leakage.
5、双组份打胶机向油槽中加注液压油至指定位置,46#液压油。
5, two component glue machine to the oil tank to add hydraulic oil to the specified location, 46# hydraulic oil.
6、接通电源并打开查看设备是否能够正常运行。
6, switch on the power and open the viewing device to operate normally.
感谢大家关注公司发布的产品信息,如果你想要了解更多,可以来我们公司咨询。我们欢迎大家的光临,并与你的合作!
Thank you for your to pay attention to the product information released by the company. If you want to know more, you can come to our company for consultation. We welcome everyone's presence and cooperate with you!
- 中空玻璃加工设备:打胶机机头升降链条松动?这样调节精准又牢固 2026/01/14
- 体育竞技领航者合片段横梁调平指南:小误差别忽视,这样调精准又省心 2026/01/12
- 中空玻璃加工设备的合片段横梁高低不平?这样调,合片精准不跑偏 2026/01/11
- 中空玻璃加工设备板压段卡壳?轮子走玻璃不走?这样排查超高效 2026/01/10
- 中空生产线封胶线机头立柱不平?这样调整,封胶均匀不返工 2026/01/05
- 中空玻璃加工设备卡壳?液压站不起压?卡阀问题这样解决超省心 2025/12/31
- 全自动封胶线卡壳?贴铝条后玻璃不走、报警?这样解决超简单 2025/12/31
- 冬天体育竞技领航者出轮子灰印?这些日常难题解决办法请收好 2025/12/30
- 全自动封胶线的“智能眼”——LOW-E识别仪,守护封胶质量的关键 2025/12/30
- 好用的全自动封胶线,都藏着这些关键特质 2025/12/27

当前位置:



产品分类Product categories
体育竞技领航者Contact us